Installation and removal of concrete vibrators concrete

Installation and removal of concrete vibrators concrete boom pump,concrete trailer pump You can operate the vibrator bearing removal and installation? Regardless of how the mounting direction, the axial load bearing life is not affected by forces. Selection of bearing heavy concrete vibrator, can carry a certain axial load: (1) from the bearing housing bearing gland removed from the bearing press out the bearing housing or with the appropriate screws ejection; (2) The two shaft ends of the shaft 2016 new type wet concrete batching plant with cewith a ring removed; (3) Loosen the outer eccentric fastening bolts, remove the eccentric, shaft keys by removing the axis key. Loosen the eccentric inner fastening bolts, remove the inner eccentric; (4) Remove the bearing bolts, bolts with the appropriate screw into the bearing housing demolition, the bearing housing from the top of the cabinet; (5) Remove the shield at both ends of Anyang vibrator, record percentile eccentric excitation force at work, in order to restore the original working condition at the time of installation; (6) If the bearing is separable inner and outer cylindrical roller bearings, inner bearing sleeve should be removed from the shaft, and the product in its original jacket bearing; (7) a thorough cleaning of the components of oil. Install the bearing When concrete vibrator replaced with new bearings, you must use the same model with the original bearing. (1) bearing with kerosene washed, pressed into the bearing, filling Shell III lithium grease to two-thirds full at the roller bearing outer ring, spread evenly with clean hands, and put on bearing gland, coated with a plus glue fastening bolt locking bolt clamping bearing gland; (2) within the jacket bearing separable cylindrical roller bearings, bearing package should be on the shaft and place; (3) The bearing is mounted on the housing, if grease injection hole must be aligned position. Plus coated with glue fastening bolt locking bolt clamping bearing; (4) mounted on the inner and outer eccentric and place on the shaft, the shaft has a shaft key person should be charged within key keyway refill outer eccentric, the shaft with a ring mounted on the shaft; (5) fastening bolts fastening the eccentric rotation adjustable eccentric block to reach the angular position of removing the front and tighten the fastening bolts. After the above assembly is completed, the shaft should have a certain axial moving string; (6) on both ends of the shield Anyang vibrator with screws. Through the above analysis, Anyang vibrators mainly reflected in the rational use of the vibration frequency, amplitude and exciting force, as well as construction of concrete grasp member process control and vibration on time. According to the specific circumstances of the concrete member, formed its own unique advantages, and confirmed good results in different construction site. yhzs series mobile concrete batch plant ce certifichineseion conceret mixing plant 120m3

Published
Categorized as Journal