Concrete mixing station energy-saving and environmentally

Concrete mixing station energy-saving and environmentally friendly and efficient to do the following:
1, concrete mixing station Wastewater treatment: drainage ditch where wastewater generated in the gutter terminal located three sedimentation tanks, the solid-liquid separation, the configuration of a self-priming pump, mobile concrete mixer plant belt type building machine the water cycle use after precipitation, the entire Wastewater production areas to achieve by recycling all the post-processing that meet environmental emission standards.
2, merchandise mixing plant dust control: mixing station where is easy to produce dust is mainly mixing building doghouse and yard. Mixing plant belongs to the selected device closure was stirred for further eliminate dust, additional activities color plate surface for dust, dust discharge port closed space, two additional cement doghouse outside symmetrical spray jet pipes, to prevent dust spreading. Stockyard dust piled according to a fixed location, and set electric control or manual spraying device, the control of fugitive dust, dust to ensure compliance.
3, concrete mixing plant solid waste treatment: generated in the production and life of non-recyclable waste and garbage, garbage tank built unified stacked and unified management and processing. No mixing stations around schools, almost no inhabitants, environmental protection investment is less demanding, less input costs. Mixing station will strengthen the low price twin shaft concrete mixer dumper with ce iso environmental management of the mixing plant into a green-mixing station.
4, mixing station noise control: Noise mainly from the device, the selected device is configured to optimize, the smaller the noise of the device itself, to strengthen the maintenance and repair during use, namely to extend the useful life of equipment, but also reduce noise pollution.
Five Steps stabilized soil mixing station for proper operation
First, the various indicators in a timely manner approved by mixing station, keep accurate, regular checks of the clutch, brake, the lifter is flexible and reliable, the track is good, wire rope for damage type fracture, and by the test all the machines before they turn back to normal operation .
    Second, the internal and external line mixing floor check to ensure that the lines are well insulated, the exposed rotating part of the mechanical equipment to be provided protection.
    Third, prohibited large stone formula and other iron products into the storage silo, and to ensure the integrity and the normal operation of the conveyor belt, stabilized soil mixing station in the vicinity of the bucket lift and conveyor strictly prohibited.
    Fourth, the operation and js 500 liter concrete mixer observation acupuncture indicators to be set at the mixing floor work platform and protective railings, mixing floor during the operation is not carried out maintenance.
Fifth, prohibit any person from entering the bin spices, but not free the debris thrown spices compartment. Before each run, the silo must be checked, the upper and lower positions of the escalator spices must ensure safe and reliable.

Published
Categorized as Journal